{"id":5287,"date":"2026-10-07T11:52:44","date_gmt":"2026-10-07T11:52:44","guid":{"rendered":"https:\/\/daterra.de\/?p=5287"},"modified":"2026-10-08T05:40:59","modified_gmt":"2026-10-08T05:40:59","slug":"reconstruction-of-the-engineering-area-500kw-cold-room","status":"publish","type":"post","link":"https:\/\/daterra.de\/en\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/","title":{"rendered":"500 kW cooling capacity in operation \u2013 Demolition and reconstruction of the RZ technology area"},"content":{"rendered":"<div data-elementor-type=\"wp-post\" data-elementor-id=\"5287\" class=\"elementor elementor-5287\" data-elementor-post-type=\"post\">\n\t\t\t\t<div class=\"elementor-element elementor-element-89c2ccb e-flex e-con-boxed e-con e-parent\" data-id=\"89c2ccb\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-ed8b26d elementor-widget elementor-widget-text-editor\" data-id=\"ed8b26d\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>As part of a comprehensive infrastructure modernization project, <strong>Daterra (formerly FM Service)<\/strong> The deconstruction and complete reconstruction of a central technical area. The project included structural transformation: a historically developed, unstructured data center was transformed into an organized data center. <strong>Cold-gang structure<\/strong> Converted. In addition to the demolition of the old stock, the team installed a new climate system with an <strong>Cooling capacity of 500 kW<\/strong>. All measures were taken within <strong>six months<\/strong> in the continuous, uninterrupted operation of the active IT systems.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-fab9320 e-flex e-con-boxed e-con e-parent\" data-id=\"fab9320\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-7efa71a elementor-widget elementor-widget-heading\" data-id=\"7efa71a\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Project achievements: complete management of the renovation as general contractor<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-64522f1 elementor-widget elementor-widget-text-editor\" data-id=\"64522f1\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>As general contractor, Daterra assumed overall operational responsibility and leadership for the modernization project. The scope of services included the seamless technical and organizational <strong>Interface control <\/strong>All the involved trades. Through a meticulous project management team, the project team ensured that all interventions to the building structure were carried out without interrupting the active customer systems.<\/p>\n\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-98eda24 elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"98eda24\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>General contracting:<\/strong> The overall management of all departments during the dismantling of the old stock and the subsequent reconstruction of the technical area.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Project management and coordination of the subcontractors:<\/strong> Continuous coordination and monitoring of the involved trade sectors throughout the entire construction period to avoid disruption to operations.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Support for architecture:<\/strong> Technical planning and consulting for the design and construction of the external pipeline bridge and the climate control system.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Scheduling:<\/strong> The reliable timing of all construction processes ensured the specified timeframe of six months from the start of the demolition work until the key handover.<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-66255c8 e-flex e-con-boxed e-con e-parent\" data-id=\"66255c8\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-b556386 elementor-widget elementor-widget-heading\" data-id=\"b556386\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Project highlights \u2013 restructuring towards a cold aisle architecture<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-6f3a5bc elementor-widget elementor-widget-text-editor\" data-id=\"6f3a5bc\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>Daterra transformed the historically developed structures into an organized infrastructure that ensures high levels of performance density. The central milestone of the re-configuration is the reliable thermal separation of the air flows and a fail-safe media and energy supply.<\/p>\n<p>The following technical specifications characterize the modernized technology area:<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c322a7e elementor-icon-list--layout-traditional elementor-list-item-link-full_width elementor-widget elementor-widget-icon-list\" data-id=\"c322a7e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"icon-list.default\">\n\t\t\t\t\t\t\t<ul class=\"elementor-icon-list-items\">\n\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Double floor system and cold-storage enclosure:<\/strong> Highly load-bearing floor structure for targeted control of the cooling air flows<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Climate GES system:<\/strong> Powerful cooling concept with a cooling capacity of 500 kW<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Steel tube bridge:<\/strong> Custom steel construction for the safe installation of the cooling media pipes<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Power supply and route guidance:<\/strong> Mechanical and technical overhaul of the energy distribution system, including new cable-based lines through adjacent adjacent spaces<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t\t\t<li class=\"elementor-icon-list-item\">\n\t\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-icon\">\n\t\t\t\t\t\t\t<svg aria-hidden=\"true\" class=\"e-font-icon-svg e-fas-chevron-right\" viewbox=\"0 0 320 512\" xmlns=\"http:\/\/www.w3.org\/2000\/svg\"><path d=\"M285.476 272.971L91.132 467.314c-9.373 9.373-24.569 9.373-33.941 0l-22.667-22.667c-9.357-9.357-9.375-24.522-.04-33.901L188.505 256 34.484 101.255c-9.335-9.379-9.317-24.544.04-33.901l22.667-22.667c9.373-9.373 24.569-9.373 33.941 0L285.475 239.03c9.373 9.372 9.373 24.568.001 33.941z\"><\/path><\/svg>\t\t\t\t\t\t<\/span>\n\t\t\t\t\t\t\t\t\t\t<span class=\"elementor-icon-list-text\"><strong>Security technology:<\/strong> Integration of modern surveillance systems to protect the entire technical area<\/span>\n\t\t\t\t\t\t\t\t\t<\/li>\n\t\t\t\t\t\t<\/ul>\n\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-9b950c7 elementor-widget elementor-widget-image\" data-id=\"9b950c7\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img fetchpriority=\"high\" decoding=\"async\" width=\"800\" height=\"600\" src=\"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-1024x768.jpg\" class=\"attachment-large size-large wp-image-5290\" alt=\"\" srcset=\"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-1024x768.jpg 1024w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-300x225.jpg 300w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-768x576.jpg 768w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-1536x1152.jpg 1536w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-2048x1536.jpg 2048w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Rechenzentrum_Technikflaeche-16x12.jpg 16w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-245fe36 e-flex e-con-boxed e-con e-parent\" data-id=\"245fe36\" data-element_type=\"container\" data-e-type=\"container\">\n\t\t\t\t\t<div class=\"e-con-inner\">\n\t\t\t\t<div class=\"elementor-element elementor-element-5f152ec elementor-widget elementor-widget-heading\" data-id=\"5f152ec\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h2 class=\"elementor-heading-title elementor-size-default\">Project execution: structured restructuring without interruption of operations<\/h2>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-c519f2e elementor-widget elementor-widget-text-editor\" data-id=\"c519f2e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>The operational restructuring was carried out in clearly structured phases to completely eliminate any disruption to the ongoing IT operations.<\/p>\n<p>In the first phase, the project team carried out the gradual demolition of the old technology area. After the demolition of the old facilities, the following steps were taken: <strong>Pre-construction and assembly work<\/strong> for the new double-floor system and the construction of the steel structure. Subsequently, the specialist tradesmen installed the refrigeration technology, routed the cable ducts through the adjacent building areas, and renewed the energy and safety systems. After successful commissioning of all systems, the <strong>Commissioned handover<\/strong> Exactly six months after construction began.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-a656d2e elementor-widget elementor-widget-image\" data-id=\"a656d2e\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"image.default\">\n\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<img decoding=\"async\" width=\"800\" height=\"595\" src=\"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche-1024x761.jpg\" class=\"attachment-large size-large wp-image-5289\" alt=\"\" srcset=\"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche-1024x761.jpg 1024w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche-300x223.jpg 300w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche-768x570.jpg 768w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche-16x12.jpg 16w, https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/RZ_Technikflaeche.jpg 1232w\" sizes=\"(max-width: 800px) 100vw, 800px\" \/>\t\t\t\t\t\t\t\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t<div class=\"elementor-element elementor-element-72f2953 e-con-full e-flex e-con e-parent\" data-id=\"72f2953\" data-element_type=\"container\" data-e-type=\"container\" data-settings=\"{&quot;background_background&quot;:&quot;gradient&quot;}\">\n\t\t\t\t<div class=\"elementor-element elementor-element-08ea207 elementor-widget elementor-widget-heading\" data-id=\"08ea207\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"heading.default\">\n\t\t\t\t\t<h3 class=\"elementor-heading-title elementor-size-default\">Special challenges \u2013 cable-based route guidance through adjacent areas<\/h3>\t\t\t\t<\/div>\n\t\t\t\t<div class=\"elementor-element elementor-element-ac38843 elementor-widget elementor-widget-text-editor\" data-id=\"ac38843\" data-element_type=\"widget\" data-e-type=\"widget\" data-widget_type=\"text-editor.default\">\n\t\t\t\t\t\t\t\t\t<p>The demolition and reconstruction work required the utmost precision, as the <strong>Demolition and reconstruction during operation<\/strong> The active system architecture was implemented. To prevent dust emissions, vibrations, and thermal fluctuations from existing IT areas, the assembly team implemented structural protective measures and scheduled noise-intensive work outside of regular operating hours.<\/p><p>An additional technical interface was provided by <strong>Installation of new cable routes in external rooms<\/strong>. The routing of the cables through adjacent building areas used by third parties required close coordination with the respective users. All openings and installation work had to be scheduled in a timely manner to avoid interfering with the external work processes.<\/p><p>The primary requirement was to convert an unstructured inventory into a structured one. <strong>Cold-gang architecture<\/strong>, Without causing interruptions in the power supply or <span style=\"text-decoration: underline;\"><a title=\"Server room cooling\" href=\"https:\/\/www.daterra.de\/leistungen\/kuehlung-serverraum\/\">Server room cooling<\/a><\/span> This was achieved through the temporary switching of the supply paths and the gradual isolation of the server series, ensuring a smooth transition to the new structure with full fail-safe operation.<\/p>\t\t\t\t\t\t\t\t<\/div>\n\t\t\t\t<\/div>\n\t\t\t\t<\/div>","protected":false},"excerpt":{"rendered":"<p>Im Rahmen einer umfassenden Infrastrukturmodernisierung realisierte Daterra (ehem. FM Service) die Entkernung und den kompletten Neuaufbau einer zentralen Technikfl&auml;che. Das Projekt umfasste die strukturelle Transformation: Ein historisch gewachsenes, unstrukturiertes Bestandsrechenzentrum wurde in eine geordnete Kaltgang-Struktur &uuml;berf&uuml;hrt. Neben dem R&uuml;ckbau der Altbest&auml;nde installierte das Team ein neues Klimasystem mit einer K&auml;lteleistung von 500 kW. S&auml;mtliche Ma&szlig;nahmen [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5291,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-5287","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-referenzen"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.3 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Case Study: RZ-Technikfl\u00e4che mit 500 kW K\u00e4lteleistung<\/title>\n<meta name=\"description\" content=\"Entkernung &amp; Neuaufbau einer Technikfl\u00e4che mit 500 kW K\u00e4lteleistung in 6 Monaten. Umbau zur Kaltgang-Struktur im laufendem IT-Betrieb \u27a4 Mehr erfahren.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/daterra.de\/en\/references\/reconstruction-of-the-engineering-area-500kw-cold-room\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Case Study: RZ-Technikfl\u00e4che mit 500 kW K\u00e4lteleistung\" \/>\n<meta property=\"og:description\" content=\"Entkernung &amp; Neuaufbau einer Technikfl\u00e4che mit 500 kW K\u00e4lteleistung in 6 Monaten. Umbau zur Kaltgang-Struktur im laufendem IT-Betrieb \u27a4 Mehr erfahren.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/daterra.de\/en\/references\/reconstruction-of-the-engineering-area-500kw-cold-room\/\" \/>\n<meta property=\"og:site_name\" content=\"Daterra Datacenter Solutions GmbH\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-07T11:52:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-10-08T05:40:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2560\" \/>\n\t<meta property=\"og:image:height\" content=\"1920\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"s.kasprzyk\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"s.kasprzyk\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/\"},\"author\":{\"name\":\"s.kasprzyk\",\"@id\":\"https:\\\/\\\/daterra.de\\\/#\\\/schema\\\/person\\\/ef19e68fcacaf8c388fddd7349562d1d\"},\"headline\":\"500 kW K\u00e4lteleistung im laufenden Betrieb \u2013 Entkernung und Neuaufbau der RZ-Technikfl\u00e4che\",\"datePublished\":\"2026-10-07T11:52:44+00:00\",\"dateModified\":\"2026-10-08T05:40:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/\"},\"wordCount\":673,\"publisher\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Technikflaeche-scaled.jpg\",\"articleSection\":[\"Referenzen\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/\",\"url\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/\",\"name\":\"Case Study: RZ-Technikfl\u00e4che mit 500 kW K\u00e4lteleistung\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Technikflaeche-scaled.jpg\",\"datePublished\":\"2026-10-07T11:52:44+00:00\",\"dateModified\":\"2026-10-08T05:40:59+00:00\",\"description\":\"Entkernung & Neuaufbau einer Technikfl\u00e4che mit 500 kW K\u00e4lteleistung in 6 Monaten. Umbau zur Kaltgang-Struktur im laufendem IT-Betrieb \u27a4 Mehr erfahren.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#primaryimage\",\"url\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Technikflaeche-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/Technikflaeche-scaled.jpg\",\"width\":2560,\"height\":1920},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/daterra.de\\\/referenzen\\\/umbau-technikflaeche-500kw-kaltgang\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/daterra.de\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"500 kW K\u00e4lteleistung im laufenden Betrieb \u2013 Entkernung und Neuaufbau der RZ-Technikfl\u00e4che\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/daterra.de\\\/#website\",\"url\":\"https:\\\/\\\/daterra.de\\\/\",\"name\":\"Daterra Datacenter Solutions GmbH\",\"description\":\"Sustainable. Efficient. Competent.\",\"publisher\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/daterra.de\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/daterra.de\\\/#organization\",\"name\":\"Daterra Datacenter Solutions GmbH\",\"url\":\"https:\\\/\\\/daterra.de\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/daterra.de\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Daterra_Logo-2.png\",\"contentUrl\":\"https:\\\/\\\/daterra.de\\\/wp-content\\\/uploads\\\/2026\\\/03\\\/Daterra_Logo-2.png\",\"width\":580,\"height\":191,\"caption\":\"Daterra Datacenter Solutions GmbH\"},\"image\":{\"@id\":\"https:\\\/\\\/daterra.de\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/daterra.de\\\/#\\\/schema\\\/person\\\/ef19e68fcacaf8c388fddd7349562d1d\",\"name\":\"s.kasprzyk\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g\",\"caption\":\"s.kasprzyk\"},\"sameAs\":[\"https:\\\/\\\/daterra.de\"]}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Case Study: RZ technology area with 500 kW cooling capacity","description":"Demolition &amp; reconstruction of a technology area with 500 kW cooling capacity in 6 months. Conversion to a cold aisle structure in ongoing IT operation \u27a4 Learn more.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/daterra.de\/en\/references\/reconstruction-of-the-engineering-area-500kw-cold-room\/","og_locale":"en_US","og_type":"article","og_title":"Case Study: RZ-Technikfl\u00e4che mit 500 kW K\u00e4lteleistung","og_description":"Entkernung & Neuaufbau einer Technikfl\u00e4che mit 500 kW K\u00e4lteleistung in 6 Monaten. Umbau zur Kaltgang-Struktur im laufendem IT-Betrieb \u27a4 Mehr erfahren.","og_url":"https:\/\/daterra.de\/en\/references\/reconstruction-of-the-engineering-area-500kw-cold-room\/","og_site_name":"Daterra Datacenter Solutions GmbH","article_published_time":"2026-10-07T11:52:44+00:00","article_modified_time":"2026-10-08T05:40:59+00:00","og_image":[{"width":2560,"height":1920,"url":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg","type":"image\/jpeg"}],"author":"s.kasprzyk","twitter_card":"summary_large_image","twitter_misc":{"Written by":"s.kasprzyk","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#article","isPartOf":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/"},"author":{"name":"s.kasprzyk","@id":"https:\/\/daterra.de\/#\/schema\/person\/ef19e68fcacaf8c388fddd7349562d1d"},"headline":"500 kW K\u00e4lteleistung im laufenden Betrieb \u2013 Entkernung und Neuaufbau der RZ-Technikfl\u00e4che","datePublished":"2026-10-07T11:52:44+00:00","dateModified":"2026-10-08T05:40:59+00:00","mainEntityOfPage":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/"},"wordCount":673,"publisher":{"@id":"https:\/\/daterra.de\/#organization"},"image":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#primaryimage"},"thumbnailUrl":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg","articleSection":["Referenzen"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/","url":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/","name":"Case Study: RZ technology area with 500 kW cooling capacity","isPartOf":{"@id":"https:\/\/daterra.de\/#website"},"primaryImageOfPage":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#primaryimage"},"image":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#primaryimage"},"thumbnailUrl":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg","datePublished":"2026-10-07T11:52:44+00:00","dateModified":"2026-10-08T05:40:59+00:00","description":"Demolition &amp; reconstruction of a technology area with 500 kW cooling capacity in 6 months. Conversion to a cold aisle structure in ongoing IT operation \u27a4 Learn more.","breadcrumb":{"@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#primaryimage","url":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg","contentUrl":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/10\/Technikflaeche-scaled.jpg","width":2560,"height":1920},{"@type":"BreadcrumbList","@id":"https:\/\/daterra.de\/referenzen\/umbau-technikflaeche-500kw-kaltgang\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/daterra.de\/"},{"@type":"ListItem","position":2,"name":"500 kW K\u00e4lteleistung im laufenden Betrieb \u2013 Entkernung und Neuaufbau der RZ-Technikfl\u00e4che"}]},{"@type":"WebSite","@id":"https:\/\/daterra.de\/#website","url":"https:\/\/daterra.de\/","name":"Daterra Datacenter Solutions GmbH","description":"Sustainable. Efficient. Competent.","publisher":{"@id":"https:\/\/daterra.de\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/daterra.de\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/daterra.de\/#organization","name":"Daterra Datacenter Solutions GmbH","url":"https:\/\/daterra.de\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/daterra.de\/#\/schema\/logo\/image\/","url":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/03\/Daterra_Logo-2.png","contentUrl":"https:\/\/daterra.de\/wp-content\/uploads\/2026\/03\/Daterra_Logo-2.png","width":580,"height":191,"caption":"Daterra Datacenter Solutions GmbH"},"image":{"@id":"https:\/\/daterra.de\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/daterra.de\/#\/schema\/person\/ef19e68fcacaf8c388fddd7349562d1d","name":"s.kasprzyk","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/44fc54a0422931acf7970831a509dac2cc2d887f75e2fff4e0a12e08e6bc5d36?s=96&d=mm&r=g","caption":"s.kasprzyk"},"sameAs":["https:\/\/daterra.de"]}]}},"_links":{"self":[{"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/posts\/5287","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/comments?post=5287"}],"version-history":[{"count":10,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/posts\/5287\/revisions"}],"predecessor-version":[{"id":5315,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/posts\/5287\/revisions\/5315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/media\/5291"}],"wp:attachment":[{"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/media?parent=5287"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/categories?post=5287"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/daterra.de\/en\/wp-json\/wp\/v2\/tags?post=5287"}],"curies":[{"name":"WP","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}